
3
Install the I/O Module(s)
A. Align slots on module with guide rails on
base, and press onto base until terminal
base’s latch locks the module in place.
B. Repeat for each I/O module.
It does not matter where you install each I/O module, except for
these types of situations:
····
If you plan to cascade power between any I/O modules using the
V and C terminals, those modules should be grouped together.
····
For more accurate measurements, you might want to locate any
thermocouple modules away from heat sources, including network
modules or relay modules, unless you are mounting them on an FP-TB-3.
4
Connect the Network Cables
Connect the FP-2000/2010 to an Ethernet network by connecting the RJ-45
Ethernet port of the FP-2000/2010 to an Ethernet hub using a standard
Category 5 Ethernet cable.
Straight-Through
UTP Cable
Straight-Through
UTP Cable
5
322759b.qxd 7/26/01 9:52 AM Page 5