Power Up the FieldPoint System
Plug in each power supply to
the FieldPoint bank. You should
see the FP-1000/1001
ACCESS
and
STATUS
LEDs flash once
and its
POWER
LED come on
and stay on. After a few
seconds, the
POWER
and
READY
LEDs should be lit on
each I/O module. If the LEDs do
not follow this sequence, refer
to the
FP-1000/1001 User
Manual for troubleshooting
instructions.
After the hardware is installed, you should verify communication, configure the
modules, and configure your power-up states and watchdog settings.
8
14
FP-1000/1001 Quick Start Guide
ni.com
Connect to Field Devices
Use the operating instructions for each I/O module to help you connect field devices.
7
POWER and READY LEDs Stay Lit
CAUTION
Terminal bases must be connected to the FP-1000/1001 before
power is applied to the FP-1000/1001.
322731e.qxd 4/4/2003 3:40 PM Page 14