National Instruments Compact FieldPoint Mounting Accessories... Скачать руководство пользователя страница 13

© 

National Instruments Corporation

13

cFP-21xx Quick Start Guide

4. Install Connector Blocks on the Backplane

In order to connect I/O modules to input signals or to external loads, you need to 
install a cFP-CB-

x

 connector block or other connectivity accessory for each I/O 

module on the backplane. Use the connector socket to the right of each I/O module 
socket.

Caution

Do not insert or remove connector blocks or other connectivity 

accessories while power is applied to them.

1. Wire field devices as described 

in the I/O module and connector 
block operating instructions. 

Caution

Hazardous voltage 

wiring should be performed 
by qualified personnel and 
in accordance with local 
electrical standards.

2. Align the captive screws on the 

connector block with the holes 
on the backplane.

3. Press firmly to seat the connector block on the backplane.

4. Using a number 2 Phillips screwdriver with a shank of at least 64 mm (2.5 in.) 

length, tighten the captive screws to 1.1 N · m (10 lb · in.) of torque. 

5. Repeat this procedure to install additional connector blocks on the backplane.

Содержание Compact FieldPoint Mounting Accessories...

Страница 1: ...ontroller Mounting hardware DIN rail panel mount or rack mount accessory I O module s cFP BP x backplane connector blocks cables 11 30 VDC power supply Accessories Ethernet cable number 2 Phillips scr...

Страница 2: ...PE ground terminal on the cFP BP x backplane to the system safety ground The backplane PE ground terminal has the following symbol stamped beside it Connect the backplane PE ground terminal to the sys...

Страница 3: ...tall the entire system in a suitably rated UL Listed NEMA or IP enclosure Cabling Clearance Cooling Outline 51 mm 2 in All Around 4 slots 246 mm 9 68 in 8 slots 441 mm 17 4 in 127 mm 5 00 in Min 165 m...

Страница 4: ...commends that you use one of the mounting systems described in this document If you decide to use a custom mounting solution make sure that the screws you use are short enough to fit in the holes in t...

Страница 5: ...ten the panel mount plates to the back of the cFP BP x using a number 2 Phillips screwdriver and the 8 32 5 16 in countersink screws shipped with the kit Caution Do not use screws longer than 5 16 in...

Страница 6: ...art Guide 6 ni com 104 78 mm 4 1 in 63 50 mm 2 5 in 22 23 mm 0 9 in 33 15 mm 1 3 in 129 54 mm 5 1 in 311 40 mm 12 3 in 387 60 mm 15 3 in 407 80 mm 16 1 in 127 00 mm 5 0 in 440 94 mm 17 4 in 260 mm 10...

Страница 7: ...ane on a DIN Rail NI recommends DIN rail mounting for the cFP BP 4 only Use panel mounting or rack mounting for the cFP BP 8 The DIN rail mounting kit is NI part number 778614 01 1 Fasten the DIN rail...

Страница 8: ...edge of the DIN rail into the deeper opening of the DIN rail clip 3 Press down firmly on the backplane to compress the spring until the clip locks in place on the DIN rail 4 Connect the PE ground ter...

Страница 9: ...ck Start Guide Mounting the Backplane in a Standard 19 in Rack 1 Fasten the rack mount bracket to the back of the cFP BP x using the captive screws on the bracket 2 Bolt the rack mount accessory to a...

Страница 10: ...P 21xx Quick Start Guide 10 ni com 3 Connect the PE ground terminal on the cFP BP x to safety ground Caution Disconnect power before removing the backplane from the DIN rail NA TIO NA L INS TR UM EN T...

Страница 11: ...p with the NI logo at the top and align the captive screws on the controller with the holes on the backplane 3 Seat the card edge at the back of the controller in the card edge connector on the backpl...

Страница 12: ...O module with the holes on the backplane 2 Press firmly to seat the I O module on the backplane 3 Using a number 2 Phillips screwdriver with a shank of at least 64 mm 2 5 in length tighten the captive...

Страница 13: ...accessories while power is applied to them 1 Wire field devices as described in the I O module and connector block operating instructions Caution Hazardousvoltage wiring should be performed by qualif...

Страница 14: ...Caution To prevent data loss and to maintain the integrity of your Ethernet installation do not use a cable longer than 100 m If you are using a 100 Mbps Ethernet network National Instruments recommen...

Страница 15: ...using a backup power supply connect the positive lead to V2 and the negative lead to one of the C terminals The cFP 21xx uses the power supply with the higher voltage level V2 is isolated from the oth...

Страница 16: ...er about three seconds the STATUS LED begins flashing steadily The cFP 21xx is ready to be configured If you have already assigned an IP address to the cFP 21xx the STATUS LED turns off The total boot...

Страница 17: ...the National Instruments FieldPoint Software CD into the CD ROM drive on your computer 4 Follow the onscreen instructions to complete the installation Note If the setup does not launch automatically s...

Страница 18: ...ed in the installation instructions You must connect the protective earth PE ground terminal on the cFP 1808 to the system safety ground The backplane PE ground terminal has the following symbol stamp...

Страница 19: ...u must insulate signal connections for the maximum voltage for which the Compact FieldPoint product is rated Do not exceed the maximum ratings for the product Do not install wiring while the product i...

Страница 20: ...tlet for example 115 V for U S or 230 V for Europe Examples of Measurement Category II are measurements performed on household appliances portable tools and similar products Measurement Category III i...

Страница 21: ...unless power has been switched off or the area is known to be nonhazardous Equipment must be used within its electrical and environmental ratings Refer to the Specifications section Refer to the prod...

Страница 22: ...r information about the memory used by the LabVIEW Real Time Module and the operating system go to ni com info and enter rdfpec Serial Ports cFP 2100 One RS 232 serial port cFP 2110 Two RS 232 serial...

Страница 23: ...und Continuous 100 Vrms Dielectric withstand 740 Vrms verified by 5 s test Power Requirement Power supply range 11 30 VDC Recommended power supply cFP BP 4 system 15 W cFP BP 8 system 20 W Power consu...

Страница 24: ...he isolation voltage ratings must be lowered Pollution Degree 2 Shock and Vibration Operating vibration Random IEC 60068 2 64 10 500 Hz 5 grms Sinusoidal IEC 60068 2 6 10 500 Hz 5 g Operating shock IE...

Страница 25: ...andards for electrical equipment for measurement control and laboratory use EN 61326 IEC 61326 Class A emissions Basic immunity EN 55011 CISPR 11 Group 1 Class A emissions AS NZS CISPR 11 Group 1 Clas...

Страница 26: ...fication column Cabling The table below shows the standard Ethernet cable wiring connections for both normal and crossover cables Ethernet Cable Connector Pinouts Pin Connector 1 Connector 2 Normal Co...

Страница 27: ...ted States contact your local branch office Australia 1800 300 800 Austria 43 662 457990 0 Belgium 32 0 2 757 0020 Brazil 55 11 3262 3599 Canada 800 433 3488 China 86 21 5050 9800 Czech Republic 420 2...

Страница 28: ...n on ni com legal for more information about National Instruments trademarks Other product and company names mentioned herein are trademarks or trade names of their respective companies For patents co...

Отзывы: