![National Instruments 2806 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/national-instruments/2806/2806_installation-instructions_3424661004.webp)
© 2010–2011 National Instruments Corporation. All rights reserved.
375530B
Aug11
LabVIEW, National Instruments, NI
,
ni.com, the National Instruments corporate logo, and the Eagle logo are trademarks of National Instruments
Corporation. Refer to the
Trademark Information
at
ni.com/trademarks
for other National Instruments trademarks. Other product and
company names mentioned herein are trademarks or trade names of their respective companies. For patents covering National Instruments
products/technology, refer to the appropriate location:
Help»Patents
in your software, the
patents.txt
file on your media, or the
National
Instruments Patents Notice
at
ni.com/patents
. Refer to the
Export Compliance Information
at
ni.com/legal/export-compliance
for the National Instruments global trade compliance policy and how to obtain relevant HTS codes, ECCNs, and other import/export data.
If the latches do not engage, ensure that the expansion bridge is inserted in the orientation
shown in Figure 2. The expansion bridge fully inserts only with the correct edge up.
Note
The NI 2806 expansion bridge should not be used above the operational shock
limit. Refer to the NI SwitchBlock carrier or card specifications for these limits.
Remove or secure the NI 2806 prior to shipping and prior to use in a high-shock
environment.
Note
To prevent unintentional shorts of source channels between hardwire analog
bus paths, you cannot use any NI SwitchBlock carrier connected by the NI 2806
expansion bridge until all connected carriers have been loaded by the driver. Failure
to load the driver on any carrier connected by the expansion bridge will disable all
other carriers connected to the same bus.
Removing the NI 2806 Expansion Bridge
Complete the following steps to remove the NI 2806 expansion bridge:
1.
Power off the chassis.
2.
Squeeze the expansion bridge latches and pull gently on the expansion bridge.
3.
Remove the carriers that were connected to the expansion bridge.
4.
Reinstall the expansion bridge connector covers with the provided 2-56 × 3/16 inch long,
pan head screws.