INTELLIREAM
®
MP
pg.
45
D.2 Spray Containment Parts Diagram
D.3 Spray Containment Preventative Maintenance
The spatter containment unit will require periodic maintenance to ensure a dependable service life. The
following schedule is recommended.
Shut off the air supply and disconnect the power cable when making adjustments.
WEEKLY
• Clean out mesh assembly: Remove the top lid using the latches on the side. Remove the mesh assembly
and clean the spatter off of the top.
• Check the level of spent anti-spatter fluid in the collection bucket below, empty when required.
ITEM
PART #
DESCRIPTION
1
IRS020099-07
Spray Containment II Top Assembly
2
IRS020099-06
Spray Containment II Mesh Assembly
3
IRS010009-00
Spray Containment Drain Quick Connect
1
2
3