NGSLR Operations Manual
Routine Alignment Verification
Document Number:
P a g e |
3 9
NASA NGSLR OPS Manual (v1.0)
5. On RAT, open the
Schedule
window and configure for Star Calibration
a. Go to the
Control
menu and select
Schedule
(Figure 5 2).
Figure 5 2: Control Menu
b. Select the
Override Schedule
button (Figure 5 3).
c. Open the
What to Do
pull down menu and select
Star Calibration
(Figure 5 3).
Figure 5 3: Schedule control window
6.
Run POP
At the DAM/POP terminal (screen #2), start the operational software by typing:
/prod/bin/pop –I <ENTER>
Note:
Be sure to start the POP software on the top part of the minute (between 5 and 25 seconds into the minute) as listed
on the GPS Time and Frequency Receiver. POP can potentially crash if it is started too close to the rollover of the minute,
which will result in a long reboot (~15 minutes).
Содержание NGSLR
Страница 2: ......
Страница 6: ...NGSLR Operations Manual Preface Document Number P a g e i v NASA NGSLR OPS Manual v1 0...