5 Operation and use
ELT-400
5-6
5.3
Measuring
5.3.1
Switching the ELT-400 on and off
Switching the ELT-400 on
✓
You have made sure of the power supply
⇒
Press the
ON/OFF
key briefly.
The basic instrument switches on.
The function test runs.
Function test
The function test checks the internal memory, display, signal processor and
internal signal paths.
•
During the function test,
– all elements of the display and the display backlight are switched on
for 0.5 seconds,
– the firmware version is displayed for about 2 seconds.
Fig. 5-3
Test display
Содержание ELT-400
Страница 2: ......
Страница 3: ...ELT 400 Exposure Level Tester BN 2304 xx Series A Operating Manual...
Страница 8: ...Notes...
Страница 12: ...1 Introduction ELT 400 1 4 Notes...
Страница 16: ...2 Safety instructions ELT 400 2 4 Notes...
Страница 22: ...3 Preparation for use ELT 400 3 6 Notes...
Страница 44: ...5 Operation and use ELT 400 5 16 Notes...
Страница 68: ...7 Remote control ELT 400 7 22 Notes...
Страница 95: ...ELT 400 B field probe connector RS 232 Scope Charge...
Страница 96: ...Notes...
Страница 100: ...Notes...