manualshive.com logo in svg
background image

 

(FigureB)

4.  Place the glass distribution panel into the base until it has been inserted completely. (see Figure B)

5.  Holding a level against the glass to level, tighten the (4) wing bolts to secure the glass panel assembly.

(Figure C).  (shim behind the glass frame as required to level)

 

(Figure C)

Отзывы: