Napoleon Modular cabinet Скачать руководство пользователя страница 4

4

www.napoleongrills.com

TOOLS REQUIRED

Check for missing or damaged parts before you begin and consult your local retailer if neccessary.

3/8

3/8 WRENCH

OR NUTDRIVER

ADJUSTABLE

WRENCH

PHILIPS

SCREWDRIVER

HAMMER

GAS AND ELECTRICAL PIPING

The piping up to the gas grill is the responsibility of the installer and piping should be located as shown in the

built-in instructions.  Do not use hose to connect the unit.  It must be connected with either rigid pipe, copper tube or an
approved flexible metal connector.  The installation must comply with CAN B149.1 Natural Gas and Propane installa-
tion code in Canada, or to the National Fuel Gas code, ANSI Z223.1 in the United States.  The minimum recommended
piping size is NPS 1/2" for rigid pipe, and 1/2" OD for copper tubing (based on a 20 ft run).  Longer runs may require
larger sizes to conform with CAN B149.1. Propane Gas Installation Code in
Canada or to the National Fuel Gas Code, ANSI Z223.1 in the United States.
Look to the manual that came with the gas grill for further
instructions.

To ease installation and piping, removable knockouts

have been provided in the side panels and in the center of each
backpanel.  The knockouts in the side panels should be removed
before the cabinets are bolted in a row.  Only remove the knock-
outs that are required for the piping of any gas, plumbing or
electrical lines.

KNOCKOUTS

Содержание Modular cabinet

Страница 1: ...o sures only and must be installed and serviced by a qualified installer to local codes Afin d assembler correctement votre gril encastr veuillez vous r f rer ce manuel ainsi qu au manuel principal Co...

Страница 2: ...ted but defective part s NAPOLEON will not be responsible for the installation labour or any other costs or expenses related to the re installation of a warranted part and such expenses are not covere...

Страница 3: ...or freestanding in an island configuration An optional 4 spacer panel must be purchased and installed when placing an island against a wall to allow clearance for the grill lid to open The spacer also...

Страница 4: ...nstalla tion code in Canada or to the National Fuel Gas code ANSI Z223 1 in the United States The minimum recommended piping size is NPS 1 2 for rigid pipe and 1 2 OD for copper tubing based on a 20 f...

Страница 5: ...grills com 4 x N570 0026 14 x 1 2 6 x N570 0026 14 x 1 2 ALIGN REAR EDGES ALIGNEZ LES BORDS ARRI RE IM UDC SIDE PANELASSEMBLY ASSEMBLAGE DES PANNEAUX LAT RAUX IM UDC REAR PANELASSEMBLY ASSEMBLAGE DU P...

Страница 6: ...N570 0013 8 x 1 2 1 2 DOOR CAN BE MOUNTED AS LEFT OR RIGHT OPENING LA PORTE PEUT TRE INSTALL E POUR S OUVRIR GAUCHE OU DROITE IM UDC TOP BOTTOM RAIL ASSEMBLY ASSEMBLAGE DES RAILS SUP RIEUR ET INF RIE...

Страница 7: ...10 www napoleongrills com 4 x N570 0026 14 x 1 2 6 x N570 0026 14 x 1 2 IM UTC SIDE PANELASSEMBLY ASSEMBLAGE DES PANNEAUX LAT RAUX IM UTC REAR PANELASSEMBLY ASSEMBLAGE DU PANNEAUARRI RE...

Страница 8: ...N570 0026 14 x 1 2 4 x N570 0026 14 x 1 2 4 x N570 0013 8 x 1 2 IM UTC PROPANE TANK SLIDER ASSEMBLY ASSEMBLAGE DE LA GLISSI RE POUR R SERVOIR DE PROPANE IM UTC TOP BOTTOM RAIL ASSEMBLY ASSEMBLAGE DES...

Страница 9: ...12 www napoleongrills com 2 x N105 0011 IM UTC PROPANE TANK DRAWER INSTALLATION INSTALLATION DE LA TABLETTE POUR R SERVOIR DE PROPANE IM UTC CABINET DOORASSEMBLY ASSEMBLAGE DE LA PORTE DU CABINET 1 2...

Страница 10: ...Le branchement du gaz des grils Napol on se trouve la gauche du panneau de contr le Placer le cabinet pour r servoir de propane gauche du cabinet pour gril simplifiera l installation de la tuyauterie...

Страница 11: ...www napoleongrills com 4 x N570 0026 14 x 1 2 4 x N570 0026 14 x 1 2 CABINET TO CABINET ASSEMBLY INSTALLATION DE CABINETS C TE C TE IM 45T CABINET 45 DEGREE CONNECTION RACCORDEMENT DE CABINETS 45 DEGR...

Страница 12: ...ww napoleongrills com 12 x N570 0026 14 x 1 2 4 x N570 0026 14 x 1 2 IM CEP CABINET END PANEL KIT ENSEMBLE DE PANNEAU D EXTR MIT IM 45T x 2 CABINET 90 DEGREE CONNECTION RACCORDEMENT DE CABINETS 90 DEG...

Страница 13: ...OP FLANGE OF THE SIDE PANELS TO ALLOW FOR FASTENERS FIXEZ LE COMPTOIR EN RESPECTANT LES DIRECTIVES DU FABRICANT DES TROUS ONT T M NAG S DANS LE REBORD SUP RIEUR DES PANNEAUX LAT RAUX POUR Y INS RER LE...

Страница 14: ...ETE INSTRUCTIONS GAS PIPING MUST BE DONE BYA LICENSED GAS INSTALLER CABINET LEVELING PROCEDURE MISE DE NIVEAU DU CABINET POUR DES DIRECTIVES COMPL TES CONSULTEZ LE MANUEL QUI ACCOMPAGNE LE GRIL ENCAST...

Страница 15: ...2 8 n555 0023 door pivot rod tige pivot de porte 9 n225 0039 door porte 10 n080 0227p fridge door mounting bracket support de fixation de la porte du r frig rateur 11 n570 0013 screw 8 x 1 2 crou 8 x...

Страница 16: ...570 0013 screw 8 x 1 2 ecrou 8 x 1 2 8 n010 0677 draw er assembly assemblage du tiroir 9 n010 0575p assembly bottom shelf ensemble de tablette inf rieur 10 n570 0031 leveling foot mise niveau du pied...

Страница 17: ...10 0583p bottom shelf tablette inf rieur 10 n585 0062p n585 0050p n585 0053p n585 0059p n585 0051p n585 0052p draw er dripshield cran anti gouttement pour tiroir 11 n570 0013 n570 0013 n570 0013 n570...

Страница 18: ...ter le bureau de service du clientele veuillez prendre note que notre guide de d panage est maintenent dispoible sur le net a www napoleongrills com Ici vous trouver beaucoup d information comme les i...

Страница 19: ..._________________________________________________________________________________________ TEL _________________________________ FAX ______________________________ EMAIL _______________________________...

Страница 20: ......

Отзывы: