Important Installation Tips
To mount, apply
strong pressure
in a circular motion to the
center of
the panel for
30 seconds.
The Controller and Power
Supply can be connected to any
panel in your setup.
Tape is
NOT suitable for textured,
porous, popcorn and ceiling surfaces
(ie. wallpaper or brick walls).
Before mounting your panels,
clean your surface to be free of
dust, moisture and oil.
Make sure you have enough PSUs for your layout.
NOTE: Each standard PSU
supports up to 42W and each Controller supports up to 500 panels. Use our PSU
calculator at
nanoleaf.me
/
myshapes.
1x
42W
1x
500x
Содержание Shapes
Страница 2: ......
Страница 3: ...Light Panels Mounting Plates Mounting Tape Linkers ...
Страница 4: ...User Manual nanoleaf me myshapes ...
Страница 6: ...1 Nanoleaf App Layout Assistant ...
Страница 7: ...2 3 ...
Страница 8: ...4 ...
Страница 9: ...1 2 ...
Страница 59: ...Still Need Help nanoleaf me support ...
Страница 60: ......