High Temperature chamber furnace 

             

Operations Manual 

 

 

Содержание Zetamix ZetaSinter

Страница 1: ...ry 2022 NANOE SAS C O N T A C T N A N O E C O M 3 3 9 8 1 9 8 3 3 6 4 6 R U E D E S F R E N E S 9 1 1 6 0 B A L L A I N V I L L I E R S F R A N C E W W W N A N O E C O M High Temperature chamber furna...

Страница 2: ...before using Content 1 Furnace Description 3 2 Technical Specifications 3 3 Safety 4 a Intended use b Assembling c Operation d Maintenance 4 Assembling 6 5 Temperature controller 8 6 MoSi2 HeatinG el...

Страница 3: ...s are to be placed inside the chamber on ceramic plates or crucibles 2 Technical Specifications Heating Power 9kW Voltage Frequency Current 3 phases neutral 380V 50Hz 32A Maximum temp 1600 C Working T...

Страница 4: ...ation use and maintenance must be done according to this operation manual b Assembling Assembling must be done according to this operation manual Danger due to electrical Current During installation a...

Страница 5: ...furnace temperature is above 500 C After replacing the temperature controller its settings must be adjusted before use Security warning Do not touch the inner or outer surface of the furnace during o...

Страница 6: ...uit breaker turn on the power the green light comes on and the cooling fan starts to work Turn the lock button clockwise the temperature control unit is now switched on Press the Turn On button green...

Страница 7: ...20 C03 300 t03 65 C04 100 t04 121 For the first high temperature heating above 400 C heating element must be passivated for 2 hours at 1200 C cf heating element chapter Using the temperature controlle...

Страница 8: ...ure 50 C at room temperature SV StoP is alternately displayed on the lower window Process value Thermo couple temperature C P V Setting value temperature C Program state S V Setting key confirm KEY Da...

Страница 9: ...ve to the next parameter The program parameters are displayed in the following order setpoint1 time1 setpoint2 time2 Press and hold to return to the previous setting The program step can be changed at...

Страница 10: ...10 ZetaMix System Specific settings Time Setting...

Страница 11: ...un Hold states Run state In Stop state press and hold until the SV window displays the run symbol The controller runs the defined program Hold state In Run state press and hold until the SV window dis...

Страница 12: ...o form a protective layer against oxidation new heating elements must be heated to 1200 C for 2 hours with a ramp of 3 C min cf 4 Assembling This process should be done when using a Zetasinter for the...

Страница 13: ...f the furnace chamber Then follow the procedure to tighten the screw and complete the heating element replacement 7 Troubleshooting Failure Code 1 Code 2 Explanation Solution No power The furnace is n...

Страница 14: ...el The green power light is off and the red open circuit light is off Same as the previous failure and the red light is broken Same as the previous failure and change the red light The current of the...

Страница 15: ...15 ZetaMix System 8 Electrical schematic diagram 380V Electrical schematic diagram...

Страница 16: ...ld the desired heating curve The number displayed by the letter C or T corresponds to the number of the segment 7 Note that a plateau can be added by choosing the same temperature as the temperature o...

Страница 17: ...bed above is in conformity with the relevant Union harmonisation legislation EU directive on low voltage electrical equipments 2014 35 UE EU directive on machinery 2006 42 EC 6 Applicable standards fo...