RE-ASSEMBLY AND TEST
1. Reasemble the Ride Assemblies to the Monitor Cabinet, taking care not to trap any
wires.
2. Reconnect the Mains-In and switch ON.
3. Reinitialize both players. (see section 6-8 page 58 of the Operators Manual).
4. Reset all game settings to the required levels. (see section 6-7 ‘Test Mode’ page 47 of
the Operators Manual).
CONVERSION IS NOW COMPLETE.
Содержание Final Furlong 2
Страница 1: ...FINAL FURLONG 2 CONVERSION INSTRUCTIONS ...