7
LINE CONNECTIONS
ATTACHING FLYING LINES TO A 4-LINE KITE
All Naish Control Systems are delivered
assembled and ready to use.
1) Begin with the flying lines from the 4-line
control system laid out directly upwind of
the kite.
WARNING: Make sure all flying lines are
straight, completely free of tangles and properly
positioned for correct line connection before
attaching them to the kite.
2) Place the front and rear line connection points
outside of the leading edge and make sure
they are free of tangles and knots.
3) Attach both front flying lines to the front line
connection points.
4) Attach the left steering (rear) flying line to the
left steering (rear) line connection point.
5) Attach the right steering (rear) flying line to the
right steering (rear) line connection point.
WARNING: Naish flying lines and bridles feature
foolproof connectors to reduce the risk of
incorrect connection between front and steering
(rear) line connection points. Be sure to always
use authentic Naish flying lines and bridles when
using Naish kites and control systems.
Steering
(Rear)
Steering
(Rear)
Front
Front
LINE CONNECTIONS