Important for new buildings/installations : before turning water
on, ensure that one cold water tap is open so that dirt and
loose particles in the pipe work are flushed through the tap
(we also recommend to flush through the water supply pipe
to the cistern).
A : PRE-INSTALLATION
B : INSTALLATION
Turn off water supply to cistern and remove cistern
lid.
Flush the cistern and remove any loose dirt from
inside the tank.
Disconnect and remove the existing inlet valve.
Insert correct filter restrictor into threaded tail.
1
2
3
1
Fit the filling valve. Ensure that the valve does not obstruct
the flush mechanism. Do not overtighten the back nut
.
2
3
To adjust the water level, unclip the adjustment rod from the float.
4
B24007 B24011
SIDE ENTRY INLET VALVE
!
!
If the filling valve touches the flush mechanism
go to C: Rotation of Filling Valve.
Adjust the float basin. Check that the top of the float basin is set to
waterline (Y) and internal overflow is 20mm above the water line.
5
6
Clip the adjustment rod on the float: check that the red arm is in
low position before clipping the rod..
Turn ON water supply and check the water
level is right.
7
C : ROTATION OF FILLING VALVE
Unscrew the grey nut below the red lever by 1 turn.
This allows the side entry inlet valve to be fitted inside the most
compact cisterns.
1
While holding the red lever, rotate the filling valve into the
appropriate position.
The float basin can touch the cistern walls.
2
Make sure the float moves freely after this
adjustment has been carried out, or the inlet valve
will not shut off or will be in shut off position.
!
If pressure < 1 bar (15 p.s.i.) :
cut here (gravity pressure / header tank)
Adjustment rod
Float
Float basin
Threaded tail
Red Arm
Filter restrictor
Rubber washer
Back nut
Overflow
top level
Float
basin
top level
C
LE
VE
R IDEA
A : PRE-INSTALLATION
B : INSTALLATION
Turn off water supply to cistern and remove cistern lid.
Flush the cistern and remove any loose dirt from inside
the tank.
Disconnect and remove the existing inlet valve.
Insert correct filter restrictor into threaded tail.
1
2
3
1
B24009 9.5" FIXED
BOTTOM ENTRY INLET VALVE
If pressure < 1 bar (14 p.s.i.) : cut here (gravity pressure/header tank)
Fit the filling valve. Ensure that the valve does not obstruct the flush
mechanism. Do not overtighten the back nut.
2
Important for new build / installations : before turning water on, ensure
that one cold water tap is open so that dirt and loose particles in the
pipe work are flushed through the tap (we also recommend to flush
through the water supply pipe to the cistern before connection is made.
Connect water supply.
Turn on water supply. Allow the cistern to fill.
Adjust the water level :
A -
Turn off the water supply and flush the cistern
B -
Unclip the adjustment rod from the float
5B
C -
Adjust the height of the float basin on the
body
5C
D -
Clip the adjustment rod on the float
5D
: check that the red arm
is in low position before clipping the rod and the float is
positioned inside the float basin.
3
4
5
E -
Check the water level is right
F -
Check that the high level of the float basin is lower than
the top level of the flushing valve overflow
.
6
Turn off water
Remove cover
Unscrew retaining nut
Remove diaphragm
Wash diaphragm and assemble in reverse order
Screw retaining nut and tighten. Ensure it is correctly positioned.
Assemble cover on nut and ensure it is clipped fully on nut
Turn on water supply and ensure the valve operates correctly
1
2
3
4
5
6
7
8
Turn off water
Disconnect the water supply
Remove filter restrictor
see image ‘A’
Wash filter restrictor
Assemble filter restrictor into threaded tail
Connect water supply
Turn on water supply
9
10
11
12
13
14
15
TROUBLESHOOTER
A
Diaphragm
25 mm minimum from internal
overflow to critical level (CL)
on inlete valve.
Adjustment rod
Float
Float basin
Body
Threaded tail
Rubber washer
Back nut
Filter restrictor