(Revised 2010-11-15)
10
N-TRON 105M12 AND 108M12 GROUNDING TECHNIQUES
Drain wire with lug connecting switch chassis to known grounding point.
CONNECTING THE UNIT
For 10Base-T ports, plug a Category 3 (or greater) twisted pair cable into the M12 connector. For
100Base-T ports, plug a Category 5 (or greater) twisted pair cable into the M12 connector. Connect the
other end to the far end station. Verify that the LNK LED’s are ON once the connection has been
completed. To connect any other port to another Switch or Repeater, use a standard Cat5 straight
through or crossover cable.
Warning:
Creating a port to port connection on the same switch (i.e. loop) is an illegal operation and
will create a broadcast storm which will crash the network!
TROUBLESHOOTING
1.
Make sure the (Power LED) is ON.
2.
Verify that Link LED’s are ON or BLINKING for connected ports.
3.
Verify cabling used between stations.
4.
Verify that cabling is Category 5 (or greater) for 100Mbit Operation.
SUPPORT
Contact N-TRON Corp. at:
TEL: 251-342-2164
FAX: 251-342-6353
www.n-tron.com