background image

Page 3

Parts List for Storage Shelter 203012(W6.1xL9.1xH3.66m)

Part

Code

Description

Qty

(PC)

1

Roof Bent Joist

7

2

Middle Bent Joist

14

3

Lower Bent Joist

14

4

Roof & Sidewall Purlin

30

5

Lower Tensioning Tube

12

6

Support Tube

2

7

Base Plate for four corners

4

8

Base Plate for interior arches

10

9

Tube Clip for support tube No.6

4

10

Stake Peg

42

11

Roof Cover

1

12

Front & Back Cover

1 each

13

Bolt M8X60 for joist

84

14

Carriage Bolt M8X70 for purlin

35

15

Bolt M10X30 for lower tensioning tube
No.5

24

16

Knitting Rope for Roof Cover (4 bundles)

1 bag

17

Cable Tie for Front and Back Cover

65

17A

Knitting Rope for Front and Back Cover
(2 bundles)

1 bag

18

Double Fork Wrench

2

19

Double Fork Wrench

2

Содержание SS203012

Страница 1: ...nstructions RECOMMENDED TOOLS Please read instructions COMPLETELY before assembly This shelter MUST be securely anchored THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE Before you start 4 individual recommended for assembly approximate time 4 hr ...

Страница 2: ...d bolt together overhead poles during assembly Beware of pole ends PROPER ANCHORING AND INSTALLATION OF FRAME PROPER ANCHORING OF THE FRAME IS THE RESPONSIBILITY OF THE CONSUMER We are not responsible for damage to the unit or the contents from acts of nature Any shelter that is not anchored securely has the potential to fly away causing damage and is not covered under the warranty Periodically ch...

Страница 3: ...corners 4 8 Base Plate for interior arches 10 9 Tube Clip for support tube No 6 4 10 Stake Peg 42 11 Roof Cover 1 12 Front Back Cover 1 each 13 Bolt M8X60 for joist 84 14 Carriage Bolt M8X70 for purlin 35 15 Bolt M10X30 for lower tensioning tube No 5 24 16 Knitting Rope for Roof Cover 4 bundles 1 bag 17 Cable Tie for Front and Back Cover 65 17A Knitting Rope for Front and Back Cover 2 bundles 1 ba...

Страница 4: ...Page 4 Frame Installation Step 1 base plates and stake pegs ...

Страница 5: ...Page 5 Step 2 end arch No 1 and No 7 ...

Страница 6: ...Page 6 Step 3 middle arch No 2 to No 6 ...

Страница 7: ...Page 7 Step 4 purlins and support tubes ...

Страница 8: ...Page 8 Step 5 squaring up the frame and fix base plates by stake pegs ...

Страница 9: ...Page 9 Cover Installation Step 1 front and back cover with door Different Way of Rolling up Door Note After the zipper is pulled in place the buckle needs to be fixed ...

Страница 10: ...Page 10 Note In order to prevent being damaged by the wind when the zipper is in the open state it cannot stay in the middle position and needs to be pulled to the top ...

Страница 11: ...raps and hang tag shows for the front and back edge of the roof cover The label of front arch and back arch is pasted to the roof cover the arch mark must touch the joint of end wall arch and top purlins Now your assembly is completed ...

Отзывы: