Myson MPE 222 Скачать руководство пользователя страница 2

INSTALLATION INSTRUCTIONS 

Step 1. Select Valve Position: 

 

Choose a suitable position for the valve in 
the circuit to be controlled, which allows 
sufficient access for wiring and 
maintenance. 
The position chosen must not isolate the 
boiler from the open vent or the cold feed 
pipe work. 
The valve may be fitted in a horizontal, 
vertical or inclined orientation and may be 
fitted on either the flow or return circuit. 
The actuator 

must not

 be fitted below the 

valve body. 

 

 
 

Step 2. Fit Valve Body to Pipe work: 

BOILER

PUMP

RADIATORS

TANK

TWO PORT

VALVES

AUTO

BYPASS

VALVE

 

Fit the valve body using the 22mm 
compression nuts provided. Ensure 
that the valve body is only gripped 
on the hexagonal faces at the valve 
ports. Take care not to over 
tighten. 

 

 

 
 
 

Step 3. Fit Actuator to Valve Body: 

 
Position the actuator on the valve body by 
locating the spindle in the cam slot. 
Rotate actuator until the locating lug (shown) 
lines up with locating lug-hole on the mounting 
plate (shown).  

 

 provided. 

Fix the actuator to the body by 

lightly

 

tightening the screws
Set the override lever to MAN. Fill, test and 
thoroughly flush the system. 

L o c atin g  

M an u a l 

Отзывы: