Intelligent Battery Backup Unit
Manual No. 771971
B-7
Operation
Battery Conditioning Prior to Use
Battery conditioning is automatic. There are no manual procedures for
battery conditioning or preconditioning to be performed by the user.
Set-up – Enabling the Write-Back Cache
The write-back cache is enabled by toggling the write-back/write-through
mode switch. The write-back/write-through mode switch is accessed in
either DACCF or in GAM. Refer to the DACCF Utilities Installation Guide
and User Manual or the Global Array Manager Installation Guide and User
Manual for instructions on how to examine and change the mode switch.
Maintenance
No maintenance is required. It is recommended that the IBBU charge level
be periodically checked using the Gas Gauge function in GAM 2.10 (see the
Global Array Manager Installation Guide and User Manual).
Содержание DAC960PG
Страница 1: ...PCI RAID Controller Installation Guide DAC960PG PCI to Ultra SCSI P N 771971 D01...
Страница 2: ......
Страница 10: ......
Страница 24: ...DAC960PG Specifications 1 10 DAC960PG Installation Guide...
Страница 35: ...Functional Description Manual No 771971 2 11 Figure 2 4 Configuration on Disk Flowchart...
Страница 40: ...RAID Management 2 16 DAC960PG Installation Guide Figure 2 10 Block Striping with Parity RAID 5 standard...
Страница 48: ...Cache Management 2 24 DAC960PG Installation Guide...
Страница 58: ...SCSI Termination 3 10 DAC960PG Installation Guide Figure 3 3 Internal Disk Array Single ended SCSI Termination...
Страница 76: ...System Reboot or Power Down 4 10 DAC960PG Installation Guide...
Страница 78: ...SAF TE A 2 DAC960PG Installation Guide...
Страница 90: ...Battery Backup Capacity B 12 DAC960PG Installation Guide...
Страница 102: ...Glossary Glossary 12 DAC960PG Installation Guide...
Страница 105: ......
Страница 106: ......