MYERS RLY-SW Series Скачать руководство пользователя страница 3

Myers Emergency Power Systems, LLC  

44 S. Commerce Way 

Bethlehem PA 18017 

      

610-868-

3500 ǀ www.MyersEPS.com

 

 

 

Installation  

In order to install the RLY-SW-2 in accordance with national/local code requirements, a qualified 

electrician should review and understand the installation instructions: Check voltage and current 

requirements. Verify and lock out circuit breakers on both regular (utility) power and 24 hours emergency 

generator or inverter circuit. Install a self-adhesive 2" x 3" caution label in each fixture or load controlled 

by an RLY-SW-2 indicating that the load is supplied from 2 different power sources: normal and 

emergency. Review wiring diagram and connect wires, one at a time, in accordance with the numeric 

identification.   

In order to provide a safe light level, when regular power is interrupted, it is recommended that a minimum 

5000 lumen are controlled by a 24 hour emergency circuit and are spaced no farther than 24' in any 

direction from each other in a normal 9' white ceiling environment.   

Initial Testing and Troubleshooting  

In a new installation, where hundreds of devices may be used, each having as many as 14 wires to be 

correctly connected, it is important that a fast, convenient method is used to check connections. In order 

to test that the wires are connected correctly, without any inconvenience to occupants, do not turn off 

regular (utility) power until you have checked each device as follows:  

1.  Check that regular branch circuit breaker is connected and utility power is available. The green LED 

should be lit. If the green LED is not lit, check connections and continuity to branch circuit breaker.  

2.  Check that the emergency branch circuit breaker is connected and emergency power is available. 

The red LED should be lit. If the red LED is not lit, check the connections and continuity to the branch 

circuit breaker.  

3.  Normal Operation Test: Turn the room switch or other control device to the “ON” position. Normal and 

emergency lights should turn on. Turn the room switch or control to the “OFF” position. Normal lights 

should turn off immediately. If the blue loop is connected, emergency lights should stay on for at least 

2.5 seconds. If the blue jumper is cut and capped, emergency lights should turn off immediately.  

4.  Emergency Operation Test: Press and hold the test button. Emergency lights should illuminate at full 

brightness until the test button is released.

 

 

Maintenance  

No maintenance is required to keep the RLY-SW-2 functional. However, regular testing should be 

performed when the lamps, ballasts, LED drivers, or arrays have been replaced or when remodeling has 

taken place. 

Single Line Drawings  

On a 20 Amp circuit, one RLY-SW-2 can control up to 

 

-

 

20

 

 Amps of emergency lighting load, or twenty RLY

 

SW-2s can each control one Amp of emergency 

 

lighting load. One RLY-SW-2 is required per switch leg 

 

or zone. 

 

 

 

 

 

 

 

 

 

Содержание RLY-SW Series

Страница 1: ...equipment without charge This warranty does not cover defects or malfunctions arising from improper installation operation repair or neglect accident or abuse Myers EPS will honor its warranty provided the equipment has not been physically damaged or improperly installed or connected To obtain warranty repair within the warranty period the defective product should be shipped freight prepaid to the...

Страница 2: ...s the need for manual monthly testing and is approved for this purpose This allows installation in any location because its test switch does not need to be accessible This feature can be disabled in the field by cutting the blue jumper Inverter or Fire Alarm Remote Test Switch Some applications demand that emergency lighting be activated upon fire alarm security alarm or remote test switch activat...

Страница 3: ...nience to occupants do not turn off regular utility power until you have checked each device as follows 1 Check that regular branch circuit breaker is connected and utility power is available The green LED should be lit If the green LED is not lit check connections and continuity to branch circuit breaker 2 Check that the emergency branch circuit breaker is connected and emergency power is availab...

Страница 4: ...O the emergency light only needs a single ballast driver The Normal Only light s shown are separate light fixtures that you want to control with the same switch but which do not serve as emergency lighting during a power interruption Can I use the RLY SW 2 with 3 way switches YES replace the single pole wall switch above with your 3 way switches Can I use the RLY SW 2 with A B switching YES but yo...

Отзывы: