7
.
D E V I C E L AY O U T
8. MACHINE INSTALLATION PROCEDURES
Note:
1.the equipment adopts 4X4mm screws. 2 when installation, keep equipment clean.
3. Undertake certain temperature conditions, installing equipment.
11
1. Firstly, install board inside the machine with wiring.
2. After install the back panel and floor with screws.
3. Then install equipment panel.
4. Finally, to install cover.
Transformer
Audio PCB Board
Power input
Panel
Power swtich
1
1
4
2
3
POWER
TREBLE
AUX 1
AUX 2
AUX 3
MIC 1
MIC 2
MIC 3
MIC 4
BASS
5
0
1
2
3
4
6
7
8
9
10
0
-5
-4
-3
-2
-1
+1
+2
+3
+4
+5
5
0
1
2
3
4
6
7
8
9
10
5
0
1
2
3
4
6
7
8
9
10
5
0
1
2
3
4
6
7
8
9
10
5
0
1
2
3
4
6
7
8
9
10
CHIME
5
0
1
2
3
4
6
7
8
9
10
ON
OFF
5
0
1
2
3
4
6
7
8
9
10
5
0
1
2
3
4
6
7
8
9
10
MASTER
5
0
1
2
3
4
6
7
8
9
10
0
-5
-4
-3
-2
-1
+1
+2
+3
+4
+5