half an hour.
Part II
1. Detailed Operation
Detailed installation is as follow:
①Jack of Shockwave probe
②Jack of foot pedal
③Switch
④Power
After checking that the instrument is connected properly, the following starting
interface will appear when the power supply is turned on.
The following interface then appears
Содержание WL-SW6
Страница 1: ...User Manual WL SW6 ...