Pro Rider Operations Manual
Rev. 08/2016
Page | 15
Introduction:
This manual provides information needed to properly operate and perform simple
maintenance and repair on this equipment.
Step-by-step operations procedures are provided.
This manual includes Installation, Start-up and Shut-Down instructions.
Step-by-step assembly and disassembly procedures are included for each
component.
Please read the manual carefully. Follow the steps in the order given, otherwise you
may damage the equipment or injure yourself.
Major Components:
The Pro Rider Gel Coater consists of the following major components:
Resin Pump Fluid section and Air Motor
Shift Block Assembly
Catalyst Pump Assembly
Gun Assembly
Description of Controls for Spray unit:
Familiarize yourself with the Air Manifold controls, which consist of the following
regulators and gauges:
PUMP PRESSURE gauge and regulator. This controls the main air pressure to
the resin pump Air Motor.
ATOMIZING-AIR gauge and regulator. This controls the air pressure to the
catalyst nozzle on the gun. This is normally set to 18
– 25psi (1 -1.5 bar)
RESIN DUMP VALVE
– This is located on the Filter Body. This is used to
relieve gel coat pressure.