![Mutek SLNA 145sb Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/mutek/slna-145sb/slna-145sb_installation-instruction_1860052003.webp)
8. Mount the preamplifier using M3 screws provided.
9. Solder the screens of the red and blue-coded cables to the earth tag on
the tag strip by the PA compartment.
10. Solder the long centre conductor of the blue-coded cable to the stand-off
in the PA compartment from which L02 was removed.
11. Solder the centre of the red-coded cable to the centre tag of the same tag
strip.
12. Now remove the four countersunk screw securing the back panel of the
transceiver (two on each side) and very carefully ease it a way from the
area of main work.
13. Now locate transformer T101 (T01 in some manuals). This is shiny can
next to the C101 which you should already have removed. Now look at
this area on the track side of the board – you should recognize the
diagram below. Solder the white-coded cable to the areas shown – the
centre to the pad at the input of T101, and the screen to the adjacent
ground area. This is probably most fiddly operation – do take great care
not to allow whiskers from the braid short anything out!