Messages
Yellow
Red
Solid On
Flashing
Flashing
Output is powered by grid in Line mode.
Output is powered by battery or PV in battery mode.
Battery is charging or discharging.
Fault occurs in the inverter.
Warning condition occurs in the inverter.
Solid On
Flashing
Function Keys
MENU
UP
DOWN
ENTER
Description.
Increase the setting data.
Decrease the setting data.
13
Enter setting mode and Confirm the selection in setting mode go to next selection or exit the
reset mode.
Enter reset mode or setting mode go to previous selection.
OPERATION
Power ON/OFF
Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch (located
on the button of the case) to turn on the unit.
Operation and Display Panel
The operation and display panel, shown in below chart, is on the front panel of the inverter. It includes three indicators,
four function keys and a LCD display, indicating the operating status and input/output power information.
LED Indicator
LED Indicator
AC/INV
Green
CHG
FAULT
Function Keys
LCD Setting
After pressing and holding "ENTER" button for 2 seconds, the unit will enter setting mode. Press "UP" or "DOWN"
button to select setting programs. And then, press "ENTER" or "MENU" button to confirm the selection and exit.
Setting Programs:
Program
Description
Selectable option
00
Exit setting mode
Escape
(default)
Output source priority selection
01
16
Solar energy provides power to the
loads as first priority, If solar energy is
not sufficient to power all connected
loads, Utility energy will supply power
to the loads at the same time. The
battery energy will supply power to the
load only in the condition of the utility is
unavailable. If the solar is unavailable,
the utility will charge the battery until
the battery voltage reaches the setting
point in program 21.If the solar is
available, but the voltage is lower than
the setting point in program 20, the
utility will charge the battery until the
battery voltage reaches the setting
point in program 20 to protect the
battery from damage.
Solar energy provides power to the
loads as first priority, If solar energy is
not sufficient to power all connected
loads, battery energy will supply power
to the loads at the same time. Utility
provides power to the loads only when
battery voltage drops to either low-level
warning voltage or the setting point in
program 20 or solar and battery is not
sufficient. The battery energy will supply
power to the load in the condition of the
utility is unavailable or the battery
voltage is higher than the setting point
in program 21(when BLU is selected) or
program 20(when LBU is selected). If
the solar is available, but the voltage is
lower than the setting point in program
20, the utility will charge the battery
until the battery voltage reaches the
setting point in program 20 to protect
the battery from damage.
Содержание PV18 MPPT 3 KW
Страница 1: ...420 00314 A1 3KW 5KW ...