Murdock GRT75-PF-RFS Скачать руководство пользователя страница 2

MURDOCK  MFG.  • 

15125  Proctor  Avenue  •  City  of  Industry,  CA  91746  USA 

Phone  800-453-7465  or  626-333-2543  •  Fax  626-855-4860  •  www.murdockmfg.com

Member of

Please visit

 www.murdock.com

 

for most current specifications.

Allow concrete to cure before completing installation.

Remove basin from pedestal and set aside. Align 
anchoring studs to pedestal mounting holes and secure 
pedestal to slab. To ensure plumb installation, lay a bubble 
level on fountain bowl and adjust using shims or washers 
until unit is level.

Make up connections to 3/8" OD (1/4" nominal) x 4" long 
copper tube with inline Y-strainer. Make up waste 
connection to 1-1/4" OD tailpiece provided.

Turn on water supply and test operation of bubbler by 
depressing button and adjust flow rate as required. Check 
all connections for leaks. 

Turn on water supply and test for proper operation and 
checking for leaks. 

FYI:

 Protect exposed valve assembly, tubing and tube 

openings to prevent damage to equipment or to prevent 
tubes from becoming filled with soil or debris.

Rough-in water supply for 3/8" OD (1/4" nominal) x 4" long 
copper tube connected to inline Y-strainer inlet provided. A 
supply stop by others is recommended.

Test operation of bubbler by depressing button and adjust 
flow rate as required. Check all connections for leaks.

All normal maintenance is done from above ground.

v

Always  shut  off  water  supply  when  doing  any 

maintenance.

v

To remove pushbutton assembly

 remove bowl 

from  housing.  From  inside  of  the  housing,  remove 
inlet  and  outlet  lines  from  push-in  ports  of  valve 
body.  Using  a  spanner  wrench  remove  pushbutton 
and retaining ring.

v

To  replace  regulator

,  use  a  spanner  wrench  to 

remove  pushbutton  and  retaining  ring  from  the 
flange  collar.  Use  a  spanner  wrench  to  remove 
retainer from the inside of the flange collar. Remove 
regulator, insert new regulator and align ports to new 
regulator  with  mating  ports  of  valve  body  then 
replace retaining ring.

v

To  access  bubbler

,  remove  bowl  from  housing 

assembly.  Remove  bubbler  plug  with  a  spanner 
wrench and remove nut holding bubbler in place.

v

Re-assemble in reverse order

. When replacing 

inlet and outlet lines, ensure to insert supply line into 
valve  port  labeled  “IN”.  Ensure  plastic  lines  are  not 
kinked when fountain is reassembled.

WATER  COOLERS

I N S TA L L AT I O N / M A I N T E N A N C E  I N S T R U C T I O N S

CONTEMPORARY  DRINKING  FOUNTAINS

I N S TA L L AT I O N / M A I N T E N A N C E  I N S T R U C T I O N S

Valve Body w/

Flange Collar

Brass Nut

Regulator

Retainer

Fiber Ring

Rubber Gasket

Retaining

Ring

Pushbutton

1/4" Push-In

Elbows

Page 2 of 3

9938-159-M01

  07/21/14

INCREASE

FLOW

DECREASE

FLOW

Ø3/16"

HOLE

SLOTTED
SCREWDRIVER

FLOW ADJUSTMENT

Отзывы: