A152-VR
Page 8 of 11
Date:
10/29/2020
7021-022-001
MURDOCK MFG. •
15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com
Member of
NOTE: FITTINGS AND TUBE SHOULD BE KEPT
CLEAN, BAGGED AND UNDAMAGED PRIOR
TO INSTALLATION.
PUSH-IN FITTING INSTALLATION
2. Pull on the fitted tubing to ensure it is secure.
Tube should not come free from the fitting. Water
test the connection assembly prior to leaving the
site to ensure there are no leaks.
DISCONNECTING THE TUBE:
To disconnect the tube from the fitting ensure that
the water line is depressurized. Push collet square
towards the push-in fitting body and hold. While
holding the collet in, pull on the PE tubing to remove
from the push-in fitting.
TO CUT TUBE:
Cut to fit length of 1/4” PE tubing and remove any
burrs or sharp edges. Ensure that the outside
diameter is free from score marks. Tube ends
should be square.
INSERTING THE TUBE:
1. Firmly and fully insert the tubing end into the
push-in fitting up to the tube stop located
approximately ½” deep.
COLLET
COLLET
O-RING
O-RING
TUBE STOP
COLLET
COLLET
COLLET
CONTEMPORARY WATER COOLERS
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
DRINKING FOUNTAINS