Install electronic controls in a separate ventilated control room that is protected from extreme
temperatures and dirty environments. Place the controls so that the operators can conveniently
use the control and read indicators and displays.
•
Keep low voltage wires separate from high voltage wires.
•
Use shielded wiring for low level signals. For buried wiring (building to building runs) use high
grade jell filled cables that are impervious to moisture.
•
Seal cable entry points and control boxes to prevent contamination and corrosion. If you use
silicon sealant with acetic acid cure, keep the control open and ventilated until cured.
Otherwise, the acetic acid will attack the metal parts, including circuitry.
3.1.2
W
HAT
C
OMES IN THE
P
ACKAGE
•
One TRIO unit
•
One hanging bracket
•
Two screws
3.2
Mounting the Unit
•
•
3.2.1
K
NOCKOUTS
1. Using the supplied clips and screws, mount the TRIO.
2.
On the bottom the TRIO are knockouts used to route the low and high voltage cables.
Figure 1: TRIO Knockouts and PG Size
o
Using a screwdriver and a hammer, gently apply pressure to the knockouts.
o
Only open up the holes that you require.
o
Munters recommends removing the knockouts before mounting the unit.
o
16*: Use this knockout for the Ethernet cable.
3. Place the required cables through the cable holders at the bottom of the unit.
CAUTION
Run low voltage cables through one knockout and high voltage relay cables through a
separate knockout. Do not place them in the same knockout!
4. Close the TRIO enclosure lid carefully and tightly. Use RTV silicon or equivalent sealant to seal
the cable holders.
Содержание TRIO
Страница 18: ... Munters AB 2020 18 Figure 5 Relay wiring detailed view Figure 6 Relay and port numbering ...
Страница 31: ... Munters AB 2020 31 Figure 27 Static pressure tubes NOTE After installing the RPS no Cold Start is required ...
Страница 86: ... Munters AB 2020 86 ...
Страница 88: ... Munters AB 2020 88 4 Verify that each channel is enabled ...
Страница 90: ... Munters AB 2020 90 The following screen should appear 7 15 3TESTING THE BIRD SCALE 1 Click Test ...
Страница 117: ... Munters AB 2020 117 4 Click the fan in the upper right Both fans turn blue 5 Define fans as required ...
Страница 170: ... Munters AB 2020 170 Click to view the bird scale data ...
Страница 180: ... Munters AB 2020 180 25 3 2TRIO 20 CONTAINER SPARE PARTS ...
Страница 182: ... Munters AB 2020 182 25 3 3TRIO 20 DOOR CARD SPARE PARTS ...
Страница 184: ... Munters AB 2020 184 25 3 4TRIO 20 MAIN CONTAINER SPARE PARTS ...
Страница 196: ... Munters AB 2020 196 Figure 36 Relay and port numbering 26 2 3POWER Figure 37 Power ports ...