
© Munters AB, 2018
12
4
Getting started
The following sections explain the basic concepts in using the Super Guard and Pig Guard controllers.
•
•
•
•
•
4.1
10 Step installation guide
This is a quick 10 step guide that will help you figure out the order of actions for a proper system
installation:
1. Hardware Installation: Read all technical specs and use the wiring diagrams, from page 46 on this
manual, to properly install all hardware.
2. Pig Guard Cold Start: Plug in the controller and hold its three keys simultaneously for a few seconds
until a CLD sign will appear. This action erases the memory completely and loads the default definitions.
3. Pig Guard Unit Number: Press the two arrow keys together until the number sign (no.) blinks. Select
the unit number with the up and down arrows and press Select.
4. Super Guard Cold Start: Plug in the controller and hold the delete key (DEL) for a few seconds until a
Cold Start sign will appear. This action erases the memory completely and loads the default definitions.
5. Super Guard setup (Room #0): Follow the instructions on page 16.
NOTE
Before making any changes make sure you are changing the correct room by checking the room
number on the upper right side of the screen.
6. Super Guard Installation: Follow the instructions from page 41. If you have more than one room,
don’t forget to change room number and install the rest.
7. Super Guard Calibration: Calibrate your equipment on each room using the service menu.
8. Super Guard Control: Follow the instructions from page 19 regarding the control parameters for each
room.
9. Super Guard Device: Follow the instructions from page 26 regarding the device settings for each
room.
10. Super Guard Management: Follow the instructions from page 33
regarding livestock and alarm
management for each room.
NOTE
The History menu is for viewing purposes only.