© Munters AB, 2013
20
2. Checking the electrical system:
•
check that the supply conductors are properly fixed to the terminals of the isolating switch;
•
check the connections of the conductors in the equipotential earthing wiring safeguard;
•
check that the guards inside the electrical panel are correctly positioned and fixed;
•
check that the safety devices are receiving power and are active, and check their effectiveness.
After this series of checks has been carried out, the fan is ready for its first startup.
Installation
Chapter5
Tension the belt after three days of operation: improper tension will lead to
premature wear on the transmission devices.
Warning