Munchkin 199VWH Скачать руководство пользователя страница 38

38

MAINTENANCE

in which case, a qualified plumber will need to be contacted to follow the Coil Cleaning Instructions
(Section D) included in this section to dissolve deposit and clean condensate line.

D. COMBUSTION CHAMBER COIL CLEANING INSTRUCTIONS*

*Before beginning this procedure, you must have on hand the following items:

– a nylon, stainless or brass brush (not steel)
– “Rydlyme” (recommended for best results) (available on line www.rydlyme.com) or “CLR”

(available at most hardware stores)

1. Shut down the Munchkin by using the following steps:

a. Close the gas valve, shut down the unit and wait for the unit to be cool to the touch
b. Disconnect the condensate hose from the 

outside

connection, 

(not from the Munchkin side)

,

so the flow can be observed.

c. Remove screws and loosen bracket holding gas valve in place.
d. Pull connector to the venturi by sliding gas valve to left, remembering to disconnect both

Molex connectors.

e. Remove the (6) 10MM nuts from the burner plate assembly to access the coils.
f.

Pull the entire burner plate assembly towards you, while removing or pushing aside any
wiring to allow the removal of the assembly.

2. Using a spray bottle filled with the recommeded product “RYDLYME” or “CLR”, spray liberally on the

coils, making sure the solution penetrates and funnels down through the condensate hose. If the con-
densate hose is blocked, let the chemical penetrate for at least 15 minutes or until it drains.

3. Use the nylon, stainless or brass brush (do not use steel) and scrub coils to remove any buildup, then

vacuum the debris from the coils.

4. Spray the coils with clear water, making sure to confine the spray to the area being cleaned (Try to avoid

getting the back cermic wall of the unit wet). Flush the combustion chamber with fresh water. At this
point, the Munchkin should be ready to power back up.

Before powering up the Munchkin follow the steps below

a. Re-install the burner assembly
b. Replace the (6) 10MM nuts to the burner plate
c. Re-connect the Molex connectors
d. Re-connect gas valve, air-gas mixer and replace bracket. 

(IMPORTANT: CHECK FOR GAS

LEAKS)

e. Re-set thermostats 

(IMPORTANT: MAKE SURE EXHAUST VENT IS NO LONGER BLOCKED!)

f.

Turn the Munchkin back on** and observe condensate flow.

g. Re-connect the condensate hose to the outside connection.

**NOTE: When firing up the boiler for the first few times you may experience some flut-
tering of the gas burner that may result in a flame lockout. This is normal and will
require you to re-cycle the unit until this clears up. This is caused by water still present
in the combustion chamber.

DANGER  

IT IS EXTREMELY IMPORTANT TO MAKE SURE THE EXHAUST VENT IS NO LONGER
BLOCKED. FAILURE TO DO SO MAY RESULT IN PERSONAL INJURY OR DEATH.

DANGER  

IT IS EXTREMELY IMPORTANT THAT YOU CHECK FOR LEAKS WHEN
RECONNECTING THE GAS VALVE AND MAKING SURE THE EXHAUST VENT IS NO
LONGER BLOCKED. FAILURE TO DO SO MAY RESULT IN SEVERE PERSONAL INJURY
OR DEATH.

Содержание 199VWH

Страница 1: ...ighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qualified installer service agency...

Страница 2: ...NTING 2 PIPE ONLY THIS IS A SEALED COMBUSTION APPLIANCE THIS HEATER INSTALLATION MUST CONFORM TO THE LATEST EDITION OF THE NATIONAL FUEL GAS CODE ANSI Z223 1 NEPA 54 AND OR CAN CGA B149 INSTALLATION C...

Страница 3: ...Condensate Removal 16 PART 5 19 thru 29 PIPING A Expansion Tank 19 B High Velocity Circulator Pump 19 PART 6 29 thru 33 START UP PROCEDURES A Sequence of Operation 29 B Items to be checked before ligh...

Страница 4: ...nt The Munchkin VWH will activate the blower motor for a pre purge of 5 seconds before going into operation Once in operation the Munchkin controller will now start to modulate the pre mix burner base...

Страница 5: ...GAL 721 GAL 399 VWH 40 120 562 GPH 615 GAL 641 GAL 399 VWH 40 130 500 GPH 553 GAL 579 GAL 399 VWH 40 140 450 GPH 503 GAL 529 GAL 399 VWH 40 150 409 GPH 462 GAL 488 GAL 399 VWH 40 160 375 GPH 428 GAL...

Страница 6: ...6 GENERAL INFORMATION DIMENSIONS Figure 1 2...

Страница 7: ...to Figure 1 1 for the recommended clear ance to allow for reasonable access to the boil er Local codes or special conditions may require greater clearances COMBUSTION AND VENTILATION AIR 1 The Munchk...

Страница 8: ...om freezing do not plug or cap the pressure relief valve GENERAL INFORMATION NOTICE Service clearance of the Munchkin 1 The front of the appliance needs 24 of clearance for service minimum It may have...

Страница 9: ...ints in the electrical compartment that must be connected to the building ground system Connect the building ground to the green ground screw and the green ground wire inside electrical box provided T...

Страница 10: ...ent is a higher test pressure than the maximum inlet pressure you must isolate the Munchkin from the gas line In order to do this you must shut the gas off using factory and field installed gas cocks...

Страница 11: ...stand by static mode and while in operating dynamic mode If an in line regulator is used it must be a minimum of 10 feet from the Munchkin It is very important that the gas line is prop erly purged b...

Страница 12: ...iping at the wall penetration to the Munchkin must be CPVC Schedule 40 or 80 to meet local fire codes The balance from the penetrated wall to the outside may be PVC Schedule 40 or 80 INTAKE VENT Use t...

Страница 13: ...e the exhaust plume or conden sation liquid will cause obtrusive or dangerous conditions Or refer to National Fuel Gas Code CAN B149 3 Never install a heat saver or similar product to capture waste he...

Страница 14: ...nation This condensate can freeze on exterior building surfaces which may cause discoloration of these surfaces Consideration should be given to the plume of condensation that exits the exhaust which...

Страница 15: ...Total of 4 Equivalent Piping with Fittings 62 Equivalent Feet Total Friction Loss in Equivalent Feet for both 3 and 4 30 62 92 Equivalent Feet 92 Equivalent Feet D HEATER REMOVAL FROM A COMMON VENT SY...

Страница 16: ...on of the common venting system the common venting system should be resized to approach the minimum size as determined using the appropriate tables in Appendix G in the National Fuel Gas Code ANSI Z 2...

Страница 17: ...e Always increase pipe in vertical position Never increase pipe size in horizontal position Figure 4 3 Sidewall Vent with V1000 or V2000 kit for standard floor units 3 piping for 199VWH 4 piping for 3...

Страница 18: ...low drainage of condensate Always increase pipe in vertical position Never increase pipe size in horizontal position Figure 4 6 Roof Vent with 3 concentric vent kit KGAVT0601CVT for standard floor uni...

Страница 19: ...ack flow device built into the system to prevent a back flow of water back into city mains Some states require back flow pre venters on all incoming water supplies Under these circumstances you will n...

Страница 20: ...e spring loaded check valve hose bib boiler drain diaphragm type expansion tank for potable water anti scald rated mixing valve pressure gauge pressure relief valve or P T relief valve union Munchkin...

Страница 21: ...nimum pipe size for connecting to a water storage tank is 1 inch 5 The minimum pipe size for connecting a Munchkin boiler is 1 25 inches for 199 VWH and 2 inches for 399 VWH 6 All pumps are shown with...

Страница 22: ...uously 4 The minimum pipe size for connecting to a water storage tank is 1 inch 5 The minimum pipe size for connecting a Munchkin boiler is 1 25 inches for 199 VWH and 2 inches for 399 VWH 6 All pumps...

Страница 23: ...isolation The alternative is standard flanges with full port ball valves and a separate flow check valve 7 Install a minimum of 12 diameters of straight pipe upstream of all circulators and check val...

Страница 24: ...tion The alternative is standard flanges with full port ball valves and a separate flow check valve 7 Install a minimum of 12 diameters of straight pipe upstream of all circulators and check valves 8...

Страница 25: ...native is standard flanges with full port ball valves and a separate flow check valve 7 Install a minimum of 12 diameters of straight pipe upstream of all circulators and check valves 8 Install vacuum...

Страница 26: ...native is standard flanges with full port ball valves and a separate flow check valve 7 Install a minimum of 12 diameters of straight pipe upstream of all circulators and check valves 8 Install vacuum...

Страница 27: ...nges with full port ball valves and a separate flow check valve 7 Install a minimum of 12 diameters of straight pipe upstream of all circulators and check valves 8 Install vacuum relief valve in accor...

Страница 28: ...nges with full port ball valves and a separate flow check valve 7 Install a minimum of 12 diameters of straight pipe upstream of all circulators and check valves 8 Install vacuum relief valve in accor...

Страница 29: ...mperature set point the gas valve is closed and the control enters a post purge state the blower will be on maximum speed 6 When the post purge is complete the control enters an idle state while conti...

Страница 30: ...ce operation and service circulator replacement condensate trap control replacement etc D OPERATING INSTRUCTIONS 1 STOP Read the safety information in Part 6 2 Turn off all electric power to the appli...

Страница 31: ...ment if needed Listed below are the recommended limits on each Munchkin Heater and the Combustion Settings Automatic modulation does not take place when the controller is in Test mode only temperature...

Страница 32: ...G N I R I F H G I H s a G l a r u t a N P L e n a p o r P w o l h g i h w o l h g i h m p p O C n o b r a C e d i x o n o M m p p 0 2 0 m p p 5 3 1 m p p 0 7 m p p 0 2 0 m p p 0 5 1 0 7 O C n o b r a...

Страница 33: ...N THE THROTTLE NEEDS TO BE ADJUSTED IT IS VERY IMPORTANT THAT A COMBUSTION ANAYLYZER BE USED TO ENSURE SAFE AND PROPER OPERATION TURN THE ADJUSTER TO THE TO INCREASE GAS OR THE TO DECREASE THE GAS SUP...

Страница 34: ...this error if uncorrected will go into a fault condition as described is Paragraph C Boiler Fault C BOILER FAULT 1 When a fault condition occurs the controller will illuminate the red fault indication...

Страница 35: ...c o l b e u l f y n a k c e h C 0 1 F r e l i o b e h T l a n g i S e m a l F f o s s o L e h t e r o f e b s e m i t 4 t h g i l e r l l i w t u o k c o l s i h t o t n i s e o g l o r t n o c n o i...

Страница 36: ...ler Resistance ohms 32 32550 41 25340 50 19870 59 15700 68 12490 77 10000 86 8059 95 6535 104 5330 113 4372 122 3605 131 2989 140 2490 149 2084 158 1753 167 1481 176 1256 185 1070 194 915 203 786 212...

Страница 37: ...zed Heat Transfer Products Representative or Certified Installing Contractor See coil cleaning instructions Section D Burner check burner for deterioration If deterioration is observed replace burner...

Страница 38: ...e chemical penetrate for at least 15 minutes or until it drains 3 Use the nylon stainless or brass brush do not use steel and scrub coils to remove any buildup then vacuum the debris from the coils 4...

Страница 39: ...39 MAINTENANCE STANDARD 925 CONTROL WIRING LAYOUT FOR 199VWH Fig 8 1 925 CONTROL WIRING LAYOUT FOR 399VWH Fig 8 2 E MUNCHKIN CONTROLLERS...

Страница 40: ...40...

Страница 41: ...41...

Страница 42: ...42...

Страница 43: ...NOTES 43...

Страница 44: ...LP 147 REV 7 7 04...

Отзывы: