2919
2920
6. Machine adjustment and use
6.1. Rendering the machine to the transport position
1. Fold the working platform stairs up.
Figure. 6.1. - 52. Fold the working platform stairs up.
When raised, the stairs (1) will be at an approximately 40 degree angle to the
working platform.
2. Raise the machine by using the tractor hydraulics.
Figure. 6.1. - 53. Marker ball valve closed
3. If the machine is equipped with markers, ensure that they are in the transportation
position and that their ball valves (2) are closed.
The ball valve is closed when the handle (1) is perpendicular to the hydraulic
hose.
Operation and maintenance
manual
Cerex 300
1.00
59 (156)
Содержание Cerex 300 SeedPilot
Страница 159: ...Hydraulic schematic Appen dix 2 Cerex 300 1 Appendix 2 Hydraulic schematic...
Страница 160: ...Hydraulic schematic Appen dix 2 Cerex 300 2...
Страница 161: ...Electrical Diagram Annex 3 Cerex 300 1 Annex 3 Electrical Diagram...
Страница 162: ...Electrical Diagram Annex 3 Cerex 300 2...
Страница 163: ...Electrical Diagram Annex 3 Cerex 300 3...