
SDTA-01
4BINSTALLATION
4. INSTALLATION
4.1 Tools and Equipment
The following tools and test equipment are recommended:
•
Safety glasses
•
Crimping tools (Amp model: 90123-2), pliers and soldering iron may also be used.
•
Tie-wraps or friction tape
•
Tarpoline, canvas
•
RMS multimeter with clamp-on meter
•
BX cable 14/2#
•
Belden cable #9305 or #20 AWG stranded
NOTE
: unpack and verify with the “Material list” that all the material is received and
in good condition.
4.2 Mounting the System
The SDTA-01 is installed in an electrical room and as close as possible to the
measurement AC voltage in order to minimise risk associated with the transmission of
AC voltage. Install the SDTA-01 on any flat wall surface. Do not install the SDTA-01
in electrical box.
NOTE
: protect the equipment from liquids.
9
Содержание SDTA-01
Страница 1: ...SDTA 01 Step Down Transformer Adapter Version 2 1 User s Manual...
Страница 2: ......
Страница 4: ...2...