
FIRST STEP:
-
UNPACKED YOUR CARTON PART 1 OF 2, LAY A,B,C,E ,F ON FLOOR RETRIEVE THE LEFT
-
HAND GABLE (A) FACING DOWN ON THE EDGED FRONT.
USING THE 30mm 8 GAUGE CONFIRMAT SCREWS PROVIDED YOU CAN NOW SCREW YOUR KICK FIRST,
BOTTOM SHELF NEXT AND THEN TOP SHELF ATTACHED ONTO THE LEFT
-
HAND GABLE. WHEN FINISHED
DO THE SAME TO THE RIGHT
-
HAND GABLE. LEAVE YOUR CARCASS FACING DOWN AND GO TO STEP 2.
STEP 2:
-
FOLD OUT YOUR BACK AND PROCEED TO NAIL (3) ON MAKING SURE YOU ARE LEVEL AT ALL
TIMES, THE BACKING IS SLIGHTLY SMALLER THAN THE UNIT SO MAKE SURE YOU START 1mm IN FROM
THE EDGE, YOUR NAILS GENERALLY SIT 100mm APART, STAND YOUR UNIT UP NOW YOU CAN PROCEED
TO PUT YOUR ADJUSTABLE SHELVES IN.
PROCEED TO POSITON
YOU
’
RE ADJUSTABLE
SHELVES (H) WHERE
NECESSARY
STEP 1
STEP 3
FINISHED
TOP
BOTTOM
STEP 2
D
PROCEED TO NAIL
YOUR BACKING ON
LAYING FACE
DOWN
H