
RAIL SUPPORT
BRACKETS
DOWELS
FIXED SHELF
KICK
TAKE YOUR GABLES AND LAY THEM OUT
FLAT, YOU SHOULD HAVE 2 X TOP &
2 X BOTTOM GABLES. USING A LITTLE
WOOD GLUE (NOT SUPPLIED) IN YOUR
PRE
-
DRILLED HOLES, INSERT YOUR
WOOD DOWELS INTO 2 OF THE HOLES
AND PUSH YOUR TOP INTO YOUR
BOTTOM GABLE.
NEXT STEP:
YOU WILL NEED TO RETRIEVE THE INFILL FROM PART 2, USING 30mm
8 GAUGE SCREWS PROVIDED, ATTACH THE INFILL TO THE UNDER
-
SIDE
OF THE CAM SHELF BEFORE PUTTING YOUR SHELF INTO PLACE.
ALIGN YOUR SHELVES AND KICK TO THE LEFT
-
HAND GABLE, SCREW THEM INTO PLACE ATTACH
YOUR RIGHT
-
HAND GABLE AND DO THE SAME.
FOLD OUT BOTH TOP AND BOTTOM BACKS, THEN SLIDE THE
H MOULD INTO BOTH BACKS TO JOIN THEM TOGETHER.
PROCEED TO NAIL THEM INTO POSITION MAKING SURE YOU
ARE SQUARE.
YOU WILL NEED 2 X 16mm WOOD
SCREWS FOR THE NEXT STEP.
TAP INTO POSITION YOUR FLANGES
INTO THE HOLES PROVIDED IF YOU
WISH YOU CAN SCREW IN 1 SCREW
INTO THE MIDDLE OF THE FLANGE
AND SLIDE ON YOUR HANGING RAIL.
NEXT:
-
YOUR PART 2 IS REQUIRED
YOU WILL NEED THE DRAWER
ASSEMBLY SHEET ON HOW TO
CREATE YOUR DRAWER.