
gBC/gBCe lighting system • operation and parts manual — rev. #1 (03/25/14) — page 19
operation
stoWing outrigger
1. Pull up the counterweight to unlock the outrigger and
pull up outrigger. See Figure 17.
Figure 17. Stowing Outrigger
2. Push in outrigger until it is all the way in and pull down
counterweight to lock it in place. See Figure 18.
Figure 18. Locking Stowed Outrigger
PULL UP
OUTRIGGER
PULL UP
COUNTERWEIGHT
PUSH IN
OUTRIGGER
PUSH IN
OUTRIGGER
raising the mast
1. Raise the second mast to the desired height and tighten
the T-bolt securely. See Figure 19.
Figure 19. Raising the Second Mast
2. To raise the mast higher, raise the third mast until the
lock/release tab pops out. The tab will automatically
rest on the second mast. See Figure 20.
Figure 20. Raising the Third Mast
danger
ALWAYS
make sure the area above
the lighting system is open and clear
of overhead power lines and other
obstructions. Contact with overhead
power lines or other obstructions could
result in equipment damage,
electrical
shock, electrocution and even death.
Caution
When raising or lowering the mast, keep hands and
fingers clear of the mast sections to prevent hand and
fingers from getting pinched.
T-BOLT
SECOND
MAST
THIRD
MAST
LOCK/
RELEASE
TAB
Содержание GBC
Страница 2: ...page 2 GBC GBCE lighting system operation and parts manual rev 1 03 25 14 proposition 65 warning ...
Страница 29: ...gbc GBCE lighting system operation and parts manual rev 1 03 25 14 page 29 notes ...
Страница 43: ...gbc GBCE lighting system operation and parts manual rev 1 03 25 14 page 43 notes ...