MULTIPLE AWNINGS - 1701, de l’industrie - Beloeil (Québec) - J3G 4S5
Tel : 450-446-4182 or 1-866-446-4182 -
www.multipleawnings.com
Revision as of January 21 2009 Page
14 of 23
Installing exterior cappings :
Once the structure is secured to the floor, the cappings can be installed. There are 8
exterior cappings that join the panels together.
•
Place the capping as seen on drawing below. Note that on one of the sides, the
grooves is smaller. Make sure you start the alignment of the capping with the
opposite side. With a rubber mallet, hit the side of the capping forcefully until
the opposite end snaps into place.
•
Start from the top of the structure and work your way down. If the walls have
been joined correctly, the cappings will snap in easily.
•
Repeat the procedure until all 8 cappings are installed.
1
st
step
Insert one side of the exterior capping,
be sure that the screen is under the
capping before the second step
You may hit the capping
with the rubber mallet
where the arrow is
pointing. Be sure that
the screen of your
second panel is under
the capping.
2
nd
step
Hit the capping on this side
Top view
Top view