
Page 7
Page 8
STEP 7
STEP 8-1
VIDEO
link
STEP 8
Ø
10
mm / 0,254 inch
DD - 01
TFC - 01
DSE - 01
VTB - 01
PL - 02
VD - 02x16
TAP - 01
K
K
OPTIONAL
HEADBOARD
K
K
WALLS MADE OF DRYWALL WITH WOODEN OR METAL STUDS
FİRST LOCATE THE STUDS BY USİNG ''STUD
FİNDER'' İN THE WALL AND DRİLL İT
ACCORDİNG TO THE HEİGHT MEASURMENTS
GİVEN ON THE SİDE.
UPPER HOLES SHOULD BE DRİLLED
FOR ATTACHİNG BED AT NEXT STEP.
SUPPLY DRYWALL FASTENERS APPROPPRIATE
TO YOUR WALL TYPE. WE RECOMMEND
USING STEEL TOGGLE BOLT ANCHOR THAT
SHOWN BELOW
NOT INCLUDED
Ø 10 mm / 0,254 inc
Ø 10 mm / 0,254 inch
DD - 01
TFC - 01
DSE - 01
VTB - 01
PL - 02
TAP - 01
Содержание A 513
Страница 1: ...Assembly Instructions VIDEO link 100min 210 min Technical Service End User A 513 ROYAL KING WALL BED ...
Страница 5: ...Page 4 VIDEO link STEP 2 210 210 STEP 3 B F D A R B F C D MNG 01 x 8 MNG 01 x 8 MNG 01 MNG 01 ...
Страница 6: ...Page 5 STEP 4 VIDEO link E E E STEP 5 MNG 01 A L 210 MNG 01 x 8 E H 01 ...
Страница 7: ...Page 6 STEP 6 VIDEO link VD 02 X 6 AVT 01X 6 VD 02 X 8 25 cm VD 02 X 8 ...
Страница 10: ...Page 9 STEP 09 VIDEO link KVL 01 MNX 03 STEP 10 MNG 01 G G 210 MNG 01 x 10 MNX 03 x 5 MNX 02 x 6 G G G ...
Страница 11: ...Page 10 STEP 11 VIDEO link LTA 01 x 26 M N P R S STEP 12 P R S P S CTA 01 PL 05 ...
Страница 12: ...Page 11 STEP 13 VIDEO link STEP 14 N M P R VTB 02 x 72 G G P M CTA 01 PL 05 24 mm 24 mm 22 mm 22 mm ...
Страница 13: ...Page 12 STEP 15 VIDEO link Unscrew the Screws STEP 16 LTA 01 x 26 G G G G ...
Страница 15: ...Page 14 STEP 19 VIDEO link 45 50 LET THE STOPPER LOCK MOVE DOWN AL 01 CTM 02 ...
Страница 16: ...Page 15 VIDEO link STEP 20 SG 01 YSB 01 VD 02 OT 056PE SC 92 OT 056D CTM 05 PL 05 KOR KKS 01 X 2 ...
Страница 17: ...Page 16 STEP 21 VIDEO link STEP 22 OT 054 CT 01 AL 01 VTB 02 X 4 KMT 01 ...
Страница 18: ...Page 17 STEP 23 VIDEO link H TAP 02 VDA 01 AL 01 H H KP 01 VKP 01 ...
Страница 20: ...www mult mobeds com ...