![Multi-Link IP Power Stone 4000 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/multi-link/ip-power-stone-4000/ip-power-stone-4000_user-manual_1854009019.webp)
-17-
Appendix C: Glossary
To
adjust
PING
INTERVAL
–
Enter
http://x.x.x.x/controller.htm
in
address
bar.
(x.x.x.x
=
IP
Address
of
IP
4000)
iii.
Outlet
Setup
Outlet
1
Name,
Outlet
2
Name
Name
the
outlet
in
order
to
identify
the
connected
device.
This
also
allows
ease
of
reference
when
using
MSN
or
setting
schedules.
Auto
reset
outlet(s)
every
IP4000
will
reset
the
outlets
every
xx
minutes.
Choose
a
figure
between
1
to
1440
minutes.
Default
is
0,
disabled.
Delay
before
checking
Website
/
IP
Address
after
power
reset
This
section
determines
if
the
outlet
will
reset
once
or
twice
WHEN
target
Website
/
IP
Address
is
no
longer
responding.
If
this
is
set
to
0
(default),
upon
Website
/
IP
Address
failing,
IP4000
will
reset
its
outlets
once
.
It
will
now
wait
until
the
target
Website
/
IP
address
responds,
before
restarting
the
check.
If
this
is
set
between
1
and
30
minutes
(eg.
5min),
then
upon
Website
/
IP
Address
failing,
IP4000
will
reset
its
outlets
(1
st
time).
It
will
then
wait
5
min,
and
check
if
the
target
Website
/
IP
address
is
responding.
If
not,
it
will
reset
its
outlets
(2
nd
time).
It
will
now
wait
until
the
target
Website
/
IP
address
responds,
before
restarting
the
check.
Outlet
power
reset
delay
Note:
1. Only the Outlet that is originally ON will be reset. If the outlet is OFF, it will not
reset. Turn it ON / OFF at Information
Æ
Current Status.
2. Power to both Outlets #1 & #2, will turn Off and then On, subject to any “Power-on
delay between Outlet 1 and Outlet 2” settings.