Option B – ventilation through the roof
Prior to installation of the Installation Kit and Connection Kit
are needed. These can be purchased from the place where
the toilet was bought.
1
. Lift the upper section (5) of the toilet, remove the urine
container (8) and waste container (3).
2. Fasten the wallbracket temporairly on the lower section
(7), put the lower sektion in posision aginst the wall.
Mark for the bracket.
3. Remove the wallbracket from the toilet. Install the
bracket on the wall.
4. Put the 90 degrees bend on the outlet.
Set the lower section in position and fasten it to the
wallbracket.
5. Make a hole in the roof for the ventilation pipe, 55 mm.
6. Install the ventilation pipes unsleeved end into the
90 degrees coupling.
7. Insulate all piping that passes through cold spaces
(e.g. in the attic and on above roof. This is to prevent
condensation.
8. Cut the exterior pipe to fit the angle of the roof.
9. Position the roof flashing. For tin roof, its better to have a
sheetmetal worker to make the flashing.
1
0. Put the outer pipe with the roof flashing over the
insulated ventilation pipe.
11
. Adjust the roof flashing to the external roof and seal
firmly with asphalt sealant between the flashing and
the roof.
1
2. Once all the piping is insulated and covered, fit the
reducing coupling on top, and then fit the insect netting.
1
3. Place a bag in the composting chamber and fold it over
the edge. Put the frame in position to lock the bag. Place
the container inside the lower section and make sure that
the bag does not cover the fan.
1
4. Put the upper section back in place.
1
5. Plug in.
1
6. Check that the Separera logo is green to confirm that the
urinecontainer is in correct position.
Sep-Mini-instruk-Behollare-EN-2022-4sid.qxp_Layout 1 2022-05-10 14:55 Sida 4