Commercial 180 x 140 Wood AOS Manual
Mugnaini Imports, Inc.
7
OVEN ASSEMBLY
Materials List (not included)
❑
Refractory Mortar
• 2 - 80lb. bag dry
• or 3 - 75lb. bucket, pre-
mixed
❑
Perlite
• 10 bags (32 cubic ft. total)
INSTRUCTIONS
STEP 1 – FLOOR LAYOUT
Floor elements (Items 1 thru 17) onto pre-established layout on thermal concrete slab.
W180 x 140 Oven
B
C
E
D
H
1
2
3
4
5
F
G
6
7
12
13
14
15
I
J
K
L
16
17
8
9
10
11
A
STEP 2 – MORTARING THE FLOOR
Using refractory mortar, place each floor element in the following succession (Item 1 thru 17). Floor pieces
should fit together as snug as possible.
Note: Due to the handmade characteristics of this product, a 1/8” gap may exist between floor elements.
DO NOT mortar or grout in between the floor element joints.
The natural gap between floor elements is designed to allow for thermal expansion.
O