![MuginUAV MUGIN-2 2930 VTOL Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/muginuav/mugin-2-2930-vtol/mugin-2-2930-vtol_build-manual_1853611019.webp)
Copyright
©
Mugin Tech Ltd
www.muginuav.com
18
Clean Wiring
To make things easier it also helps to run sleeves over each group of wires. At this point you will
have 5 sets of sleeved wiring.
1: Main Power Lead for Power Distribution Board.
2: Power Leads out to Left VTOL ESCs (Front and Rear Motors)
3: Power Leads out to Right VTOL ESCs (Front and Rear Motors)
4: D-Sub connectors for Left Side signal, GND, power lines of servos and ESCs.
5: D-Sub connectors for Right Side signal, GND, power lines of servos and ESCs.
Power Distribution Seat
With the main wiring harness complete, special thought needs to go into where to place the
power distribution board. With this particular model we are choosing to go with the interior of the
center wing. Some clients mount it in the fuselage. You are free to do as you please. We are going
with this method on this one by cutting out a slot to mount it to the interior of the center wing.