Mueller Cellular
Node User
Installation Manual
Страница 1: ...Mueller Cellular Node User Installation Manual...
Страница 2: ...nstallation 5 3 1 Pit Set Installation 5 3 2 Exterior Wall Mounting 6 3 3 Wiring 6 3 4 Verification 6 4 Maintenance 7 5 ProductLabeling 7 5 1 Product and FCC IC Identification 7 5 2 IC Information 7 T...
Страница 3: ...Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the receiver is connected Consult the dealer or an experience...
Страница 4: ...smit hourly meter data at a predetermined time once per day via the cellular network to the Sentryx system host server for analysis and storage On demand reads to the Mueller Cellular Node can be requ...
Страница 5: ...included 3 1 Pit Set Installation Please note that meters or registers should never be carried while supported only by the AMR transmitter or wiring Tools Required Length of PVC pipe for pit depth ha...
Страница 6: ...able 1 Mueller Cellular Node Meter Interconnect 3 4 Verification Activation Bluetooth The EFR32 Bluetooth subsystem is primarily responsible for one time device activation and verification Device acti...
Страница 7: ...to easily scan the label with the Bluetooth handheld device during the installation process This label includes the Date of Manufacture the Hardware Version and the Mueller Cellular Node Serial Numbe...