Building up the lifting jack:
Lifting jack in the folded up status without
plug-on handles.
Before building up all swivel rollers
must be fixed with brakes.
The load arms as well as the
stand are folded up.
Subsequently, the load arm
and the stand are connected with
the locating pin.
The locating pin becomes secured
with the quick lock pin.
Now the set up ensues.
For reinforcement two props are put over the fork-bolt
of the underframe and the stand.
Subsequently, the spindle is swivelled up and introduced
to the slot accommodation of the lateral strap
of the load arm.
Now the heading fork can be put in.
The lifting jack is ready for action.
The disassembly takes place in reverse succession.
4
0,60 m
5
6
7
8
adapter
2