
3.3 Wiring
When designing external wiring cables, please consider power,
current capacity, and the requirement for the system's overload
capacity, as well
as give a suggestion for the selection of a
reasonable cross-section size of the cable. The installation
engineer shall carry out the comprehensive selection in reference
to relevant local standards. Generally, the length of a connecting
cable is 2-10 m. Too long cable will cause voltage drop, resulting in
corresponding increase of cable cross-section.
4. Test Report
4.1 Capacity test
The capacity test is the test that evaluates the efficiency
of the battery pack by charging and discharging at 0.2C rate
(temperature is around 23-25 °C)
13
Содержание Power Box 1200
Страница 1: ...Power Box Model 1200 v 2 User Manual...
Страница 2: ...2...
Страница 7: ...2 Product Overview 2 1 Device Overview 1 Negative terminal 2 Positive terminal 3 Case 7...
Страница 10: ...2 4 Wiring Diagram Wiring diagram of Power Box 10...
Страница 11: ...2 5 Mechanical Specifications Power Box with side front and top views All unit in mm 11...
Страница 14: ...4 2 Performance test The performance is the test charge and discharge at each C rate over discharge test 14...
Страница 15: ...15...
Страница 20: ...20...