
Safety regulations
– Auxiliary materials
13
– Environmental protection
13
– Fire prevention
13
– Fluids and lubricants
13
– Important provisions
5, 6
– Maintenance work
10
– Operation
8
– Organizational requirements
7
– Personnel requirements
7
– Repair work
10
– Startup
8
Safety requirements
– Safety notices, standards
15
Sensors
– Overview
28
Service indicator
– Signal ring position check
97
Service partners
143
Shipping lock
– Installation
– Resilient mount
18
– Removal
– Resilient mount
18
SOLAS shielding
– Installation
61
– Installation locations
62
SOLAS shielding as per MTN 5233 – Installation
60
Spare parts service
143
Starter
– Condition check
98
Startup
– After extended out-of-service periods (>3 months)
41
– Putting into operation after scheduled out-of-service-pe-
riod
42
T
Tasks
– After extended out-of-service periods
43
Tasks after extended out-of-service periods (>3 weeks)
43
Transportation
– Description
16
– Lifting requirements
17
Troubleshooting
57
– Fuel treatment system
56
V
Valve clearance
– Adjustment
76
– Check
76
Venting points
106
W
Water drain valve
– Check
121
Water level probe (3-in-1 rod electrode)
– Check
123
MS150061/06E 2016-02
| Index | 153
DCL-ID: 0000010704 - 006