3 Operation
3.1 Putting the engine into operation after extended out-of-
service periods (>3 months)
Preconditions
☑ Engine is stopped and starting disabled.
☑ MTU Fluids and Lubricants Specifications (A001061/..) are available.
Putting into operation after long out-of-service periods (>3 months)
Item
Action
Engine
Depreserve (→ MTU Fluids and Lubricants Specifications A001061/..).
Lube oil system
Check engine oil level (→ Page 69).
Fuel system
Connect appropriate equipment to fuel supply line to fill the system.
Fuel system
Vent (→ Page 56).
Coolant circuit
If engine is out of service for more than one year, change engine coolant
(→ Page 80). Change charge-air coolant (→ Page 89).
Coolant circuit
Check engine coolant level (→ Page 79); Check charge-air coolant level
(→ Page 88).
Coolant circuit
Preheat engine coolant with coolant preheating unit (if fitted).
Engine governor
Check plug-in connections (→ Page 108).
Engine control system
Switch on.
22 | Operation | MS150094/01E 2012-08
TIM-ID: 0000010073 - 002