![MTU 12 V 4000 M93 x Скачать руководство пользователя страница 212](http://html1.mh-extra.com/html/mtu/12-v-4000-m93-x/12-v-4000-m93-x_operating-instructions-manual_1852651212.webp)
ENGINE DATA 16V 4000M93L, heat exchanger installed,
IMO
64
Engine emergency stop
– At BlueLine automation system (control stand)
83
Engine governor
– Cleaning
197
Engine Interface Module EIM
– Removal and installation
203
Engine layout
15
Engine Monitoring Unit EMU 8
– Plug connections check
199
Engine mounting
– Check
185
Engine oil
– Centrifugal oil filter
– Cleaning
173
– Change
163
– Filter sleeve
– Replacing
173
– Sample analysis
165
– Sample extraction
165
Engine oil level
– Check
162
Engine sides
– Designation
25
Engine wiring
– Check
193
Engine wiring harness
– Overview
36
Engine – Barring manually
127
Engine – Main dimensions
67
F
Filter
– Coalescer element
– Replacement
191
Filter sleeve
– Replacing
173
Firing order
68
Fuel
– Prefilter
– Flushing
151
– Treatment system
– Switching on
81
– Troubleshooting
96
– treatment system
– Shutdown
92
Fuel filter – Replacement
147
Fuel prefilter
– Differential pressure gauge adjustment
149
– Differential pressure gauge check
149
– Draining
150
– Filter element
– Replacement
153
– Flushing
151
Fuel treatment system
– Putting into operation
78
– Shutdown
92
– Switching on
81
Fuel treatment system control cabinet – Control elements
75
H
Hotline
210
HP pump
– Filling with engine oil
139
– Relief bore check
140
I
Injector
– Removal and installation
142
– Replacement
141
Intercooler
– Check water drain for coolant discharge and obstruc-
tion
157
Interface module EIM
– Check
200
L
Limit switch for start interlock
– Check
196
LOP
– Cleaning
207
– Connector cleaning
207
LOP – Controls
69
M
Maintenance schedule
– Maintenance schedule task reference table [QL1]
94
MTU contact persons
210
O
Oil indicator filter
– Check
171
– Cleaning
166, 171
Operational checks
74
P
Plant
– Cleaning
93
Plug connections
– Check
200
Product description
16
Pump capacity
– Check
190
Putting the engine into operation after extended out-of-
service periods (>3 months)
71
Putting the engine into operation after scheduled out-of-
service-period
72
R
Raw water pump
– Relief bore check
183
S
Safety notices, standards
13
212 | Appendix B | MS150047/04E 2013-07
DCL-ID: 0000017652 - 003