Maintenance
58
Series 505G2 SilentFlo™ Hydraulic Power Unit
Before You Begin
Spare parts
Parts that are specified in the maintenance procedures of this section can be obtained from MTS
Systems Corporation.
Lockout/tagout
For your safety, follow all appropriate lockout/tagout procedures while performing HPU maintenance.
Operating the HPU
When running the HPU, become familiar with the sounds and smells of the HPU. Changes in the
sounds and smells of the HPU might indicate that maintenance or service is needed.
Routine Maintenance Overview Checklist
Calendar Time
using 8 hour
Running Time
rate per day
Daily Weekly Monthly
Annually
Running Time-
Hours
8
40
160
500
1000 1,500 2,000
5,000 10,000
Check electronic
enclosure
ventilation
X
1
Check dirty filter
indicators
X
Check for leaks
X
Check oil level
X
Check pressure
X
Check fluid color
and odor
X
Check interlock
devices
X
Recommended service to be performed at each running time interval noted
1
Symbol denotes services performed by equipment operators. Most of these procedures involve visual
checks that should not interfere with test system operation. These checks are also completed by
trained field service engineers on each Routine Maintenance visit.
Содержание SilentFlo 505G2 Series
Страница 1: ...Series 505G2 SilentFlo Hydraulic Power Unit Model 505G2 07 Model 505G2 11 100 227 350 C ...
Страница 31: ...Installation Series 505G2 SilentFlo Hydraulic Power Unit 31 Installation Install the HPU 32 HPU Setup 35 ...
Страница 39: ...Operation Series 505G2 SilentFlo Hydraulic Power Unit 39 Operation Operator s Panel 40 ...
Страница 70: ......
Страница 79: ...Accessories Series 505G2 SilentFlo Hydraulic Power Unit 79 Caster Kit ...
Страница 80: ......
Страница 90: ...Appendix B Declaration of Conformity 90 Series 505G2 SilentFlo Hydraulic Power Unit Example ...
Страница 91: ...Appendix B Declaration of Conformity Series 505G2 SilentFlo Hydraulic Power Unit 91 ...
Страница 92: ......
Страница 93: ......