MTS Exceed™ Series 40 Site Preparation Guide
34
Moving E43 Double-Column Frames
Lift and Move Instructions
Procedure
To unpack and position the E43 load frame:
1. Move the load frame, to its final location within your building. Use a forklift
to transport the container from the shipping dock to the final location..
2. Unpack the load frame ,remain the frame still in the shipping material,.
3. Remove the shrink wrap vapor barrier encasing the load frame.
4. Remove the fixed wood blocks around the machine.
5. Use the packing list to inventory all the items. Accessories may be in the
container with the load frame or may be packaged separately.
Do not open any of the packing boxes. The packing list will indicate the
total number of boxes that are included in the shipment. Count the number
of boxes you received to make sure you have the correct number of boxes.
Do not open these boxes until the MTS service representative arrives to
install your testing system. This ensures that no parts are lost prior to
installation.
6. Position the frame into its operating location.
•
If you use the Frame base method to lift and position the frame into its
operating location, see
on page 36 for details.
•
If you use the crosshead method to lift and position the frame into its
operating location, see
on page 38 for details.
When the frame is in its operating location, you can proceed with the installation
process.
Содержание E42.503
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 16: ......
Страница 22: ......
Страница 26: ...MTS Exceed Series 40 Site Preparation Guide 26 When You Get Your System Additional Considerations...
Страница 43: ......
Страница 44: ...m m m m MTS Systems Corporation http www mts com en Global index asp ISO 9001 Certified QMS...