background image

InVue Exhibit 1024 

InVue v. MTI

Содержание FREEDOM LP3

Страница 1: ...FREEDOM LP3 PRODUCT MANUAL MTI P N 063 0825 00 Rev A Release Date March 2010 InVue Exhibit 1024 InVue v MTI...

Страница 2: ...System Corn ponents 10 Installing the Battery Backup System optional 11 Installing the Power loss Alarrn Module optional 11 Configuring the Power Boosters 12 Testing Uie System 13 Mounting Products 14...

Страница 3: ...1vers correc power to charge device batteries High bond adhesive pad Secondary security sensor S ures prod 1cl to puck ____ 4 optional not shown c A Provides add1t1onal prolecuon lo f 1 product or acc...

Страница 4: ...power and aiarm functions see page 6 tor alarm modu e details r ic housing attaches to display cabinet nas spec1ai alignment features to orient product towards front of display Retractor bracket Has...

Страница 5: ...ttery in the mounted devic0 When a pucK is lift d out of its base tho ntcrr1Ji puck bc Ucry povv crs the puck s security features and the device battery povvers that product A fully charge d puck can...

Страница 6: ...rotect the products This rechargeable battery only provides power to keep the system armed ii does not pmvide any power to operate the products Once main power is restored the system automatically rec...

Страница 7: ...hich contact the set of contacts on each puck when it is docked Each base has alignment fea IJres to keep pmdlJct properly oriented in the display Pucks can sit in each base in two orientations 180 ap...

Страница 8: ...adisplay position maximum sup crl distance 16 1 1Ti intuition Li PfJ is an optional clig tal sigr 1age dpplication aval arJle for trio Fr0edrnr1 LP system it gives custorncrs the atiility to view pro...

Страница 9: ...ents 1 Install base into pre drilled cabinet hole 1 65 diameter 2 Tt1read retractor cable up through bracket nut and base then screw into tr1readed insert in bottom of puck using the security driver 3...

Страница 10: ...etween each retractor and the Position jacks on the module mportant Connect cables in sequence starting with position 1 For example if you are using four display positions connect them to positions t...

Страница 11: ...ower Verify that one of the cl1arge1 LEDs is lit The red LED lights if system is charging the green LED lights if system is charged MT s Power Loss Aiarm Module PU M is an optional security feature fo...

Страница 12: ...not requi1 e a booster will not negatively impact the device or the performance of the device l Ensure that SraJs positions requiring the Power Booster are merchandised on alarm positions 7 and 8 2 De...

Страница 13: ...unding 6 Cycle keyswitch Verify that alarm sounder goes off and that puck s LED is flashing twice every 7 seconds when docked lote alarm may reactivate if keyswitch is cycled too quickly i 7 Repeat st...

Страница 14: ...ck and v1rap around d1 1 1ice Use tr e other ip tie to secure the head to U1c device Loavc zip ties on for at least 12 so dd hcsive bond can gain strength 9 T1 1rn en dev1c to vwify it powers on Once...

Страница 15: ...d secondary sensor if present from puck 3 Use puck 1 emoval tool to wist the puck back and forth unti the pad separates The pad should split in half leaving adhesive tape on both product and puck 4 Re...

Страница 16: ...there snot a product mounted on a puck the missing product would normally trigger an alarm because of the open sensor With the learn function however the system now thinks the missing product is norm...

Страница 17: ...chirp if t t n is E1 syst8rn maintenance i ssuo ii lt h Steady alarm siren Security alarm C8 JSE d by Prnduc1 em ivefl irom an armed puci 1 Active puck taken from the display losing communication with...

Страница 18: ...ery can only provide powe1 for a limited time up to 18 hours on afully populated alarm module Once power is restored the system returns to tr1e normal operation mode The system then automatically rech...

Страница 19: ...is or Piug povver supply into the alarm module Connect the correct SmartCable Check cab e connections between a mn rnodu e and retractor Replace damaged pdrts Ch cr contacts on pLck and base to e s Jr...

Страница 20: ...g costs All OnSite switching modules and video audio switcl1ing and distribution modules for the Audition Signal Management System Audition System are warranted to Customer for a period of five 5 year...

Отзывы: